The Porto Empedocle Power Plant, where Boldrocchi has successfully delivered on turn-key basis the GT exhaust stack for GT GE Fr 6, was inaugurated in the presence of Enel’s top management and local Authorities The stack meets the most demanding standard of combined design in structural, fluid dynamic and acoustic field, successfully verified during GT performance tests, through detailed measuring campaign.